Friday, April 11, 2025

Staff

2025 ASCE Infrastructure Report Card

The national grade for infrastructure improved from C- in 2021 to C in 2025. Nearly half of the assessed categories saw grade increases, with ports receiving the highest grade (B) and stormwater and transit rated lowest (D). For the first time since 1998, no category received a D- grade.

Who is PJM and what do they do? A primer.

Data centers, electric vehicles, and industrial electrification are driving projections of 4.5% annual load growth in PJM territory - a dramatic increase that will require new generation and transmission investments. This comes as the industry struggles with supply chain delays and workforce shortages.

Our Infrastructure Matters – Episode 3

“Our Infrastructure Matters” is a news program highlighting important infrastructure projects and issues throughout the region. From roads and bridges to rails and tunnels. From the energy and communications grids to drinking water, wastewater, and stormwater.

Trenton City Council President guest oped: Rising Energy Costs Hurts Communities of Color [The Trentonian]

"In a recent op-ed, Trenton City Council President Yazminelly Gonzalez addresses the rising energy costs and their disproportionate impact on communities of color. Drawing...

Mapping NJ’s hundreds of abandoned mines [NJ Spotlight]

New Jersey has a rich mining history dating back to the early 1700s, with iron being the most common mineral extracted. Mining thrived for...

Can NJ fix these 10 deadliest intersections? [NJ Spotlight]

"The list includes three intersections along US 1&9 in Elizabeth, two each on Route 129 in Trenton and Route 9 in Old Bridge and three along Route 27, two in Franklin in Somerset County and one in Roselle in Union County. All are slated to be upgraded with smart-signal technology or other measures designed to reduce accidents."

This I-95 bridge connecting N.J. and Pennsylvania could be replaced soon [NJ.com]

The I-95 bridge connecting New Jersey and Pennsylvania is set to be replaced soon. The bridge, which has been in use for decades, is...

NJBPU’s 2024 EMP is MIA

"...But what was presented at the meeting by consultant Energy+Environmental Economics (E3) was not a complete draft, but instead a short slide presentation titled, 'Executive Summary DRAFT'"

Join our community of SUBSCRIBERS and be part of the conversation.

To subscribe, simply enter your email address on our website or click the subscribe button below. Don't worry, we respect your privacy and won't spam your inbox. Your information is safe with us.