“The full bridge [closure] will take place from Jan. 13 to about Jan. 27. The shutdown is needed so work crews can permanently repair a deteriorated structural connection that was discovered this summer in the bridge’s second span from the Pennsylvania side.
The upcoming full bridge closure is scheduled to occur during what are often the two coldest weeks of the year. Accordingly, crossings by motor vehicles and pedestrians are at their lowest volumes during this annual period. The full bridge closure also would occur after the winter holiday season ends.”
Read the full story on MSN/Patch: https://www.msn.com/en-us/news/us/new-hope-lambertville-bridge-to-close-for-2-weeks-in-january/ar-AA1uLu6A